Server Migration (已解決)
  • 優先級 - 中
  • 影響範圍 伺服器 - Jita
  • We are currently transferring all hosting accounts to our new hosting platform (Jita-SB33). This will result in increased responsiveness of all sites including many new features to the service.

     To avoid total failure to display websites while DNS is propagating, we have bridged the databases between the legacy server and Jita-SB33. While this should negate the risk of failure to resolve the websites, if your local DNS routes you to the legacy server it may cause sluggish response times as the site will need to fetch a remote mySQL database.

    We are doing everything in our power to make this transition as smooth as possible however DNS propagation is outwith our control and can take between 24-48hrs to fully settle. 

    Estimated Downtime: See Above

     

    Server Migration Complete: All Systems Are Fully Operational  @ 21/04/2018 00:00

  • 日期 - 19/04/2018 03:34 - 21/04/2018 00:00
  • 最後更新 - 20/04/2018 23:11

伺服器狀態

以下是我們所有伺服器的即時概況,您可以在此查看是否有任何已知問題發生。

伺服器名稱 HTTP FTP POP3 PHP 資訊 伺服器負載 可用時間
Jita PHP 資訊